Northern Territory graphite project hailed as potential global leader, with a mine life extended by a decade and feasibility study supporting production plant

The open-pit mine strip ratio is estimated at 0.8:1 (waste to ore) over the life of the mine.

It’s good news for a major Northern Territory graphite project, with the latest study indicating a mine life extended by nine...


To read the rest of this article, please log in using the form below, or sign up for a free 21-day trial and explore our full range of insights.

Log In